Assessment Year | 1994 |
---|---|
Principal Product | Foof Coatings |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
40,000
ft2
|
Annual Production | 7,000,000
Tgal
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,820 | 2,157,093 |
kWh
|
$0.11 |
Natural Gas | $2,091 | 271 |
MMBtu
|
$7.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,786 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,483 | $9,520 |
$3,483
30,481
kWh
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,450 | $25 |
$1,450
12,603
kWh
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,568 | $850 |
$6,568
57,737
kWh
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $24,469 | $7,210 |
$24,469
75,615
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,928 | $10,572 |
$7,928
66,823
kWh
|
|
06 | 2.7144: Install spectral reflectors / delamp | $13,383 | $7,270 |
$13,383
110,199
kWh
|
|
07 | 2.7132: Install timers on light switches in little used areas | $1,552 | $260 |
$1,552
12,896
kWh
|
|
08 | 2.7111: Reduce illumination to minimum necessary levels | $3,874 | $240 |
$3,874
29,601
kWh
|
|
09 | 2.7135: Install occupancy sensors | $3,743 | $3,280 |
$3,743
30,188
kWh
|
|
10 | 2.7132: Install timers on light switches in little used areas | $633 | $175 |
$633
4,982
kWh
|
|
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,113 | $1,012 |
$3,113
25,205
kWh
|
|
12 | 2.7134: Use photocell controls | $2,798 | $460 |
$2,798
23,154
kWh
|
|
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $261 | $105 |
$261
1,172
kWh
|
|
TOTAL RECOMMENDED | $73,255 | $40,979 |
$73,255
480,656
kWh
|
||
TOTAL IMPLEMENTED | $48,786 | $33,769 |
$48,786
405,041
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs