ITAC Assessment: SD0075
ITAC logo
ITAC Assessment: SD0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Foof Coatings
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 7,000,000
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,820 2,157,093
kWh
Natural Gas $2,091 271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,483 $9,520 $3,483
30,481
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,450 $25 $1,450
12,603
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,568 $850 $6,568
57,737
kWh
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,469 $7,210 $24,469
75,615
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,928 $10,572 $7,928
66,823
kWh
06 2.7144: Install spectral reflectors / delamp $13,383 $7,270 $13,383
110,199
kWh
07 2.7132: Install timers on light switches in little used areas $1,552 $260 $1,552
12,896
kWh
08 2.7111: Reduce illumination to minimum necessary levels $3,874 $240 $3,874
29,601
kWh
09 2.7135: Install occupancy sensors $3,743 $3,280 $3,743
30,188
kWh
10 2.7132: Install timers on light switches in little used areas $633 $175 $633
4,982
kWh
11 2.7142: Utilize higher efficiency lamps and/or ballasts $3,113 $1,012 $3,113
25,205
kWh
12 2.7134: Use photocell controls $2,798 $460 $2,798
23,154
kWh
13 2.7142: Utilize higher efficiency lamps and/or ballasts $261 $105 $261
1,172
kWh
TOTAL RECOMMENDED $73,255 $40,979 $73,255
480,656
kWh
TOTAL IMPLEMENTED $48,786 $33,769 $48,786
405,041
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs