ITAC Assessment: OK0893
ITAC logo
ITAC Assessment: OK0893
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Metal fabrication
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 2,160
units
Production Hrs. Annual 3,300
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,402 1,184,680
kWh
Electricity Demand $40,142 5,454
kW-mo/yr
Natural Gas $8,018 980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,529

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,552 $16,400 $4,365
90,100
kWh
$2,112
-
kW-mo/yr
$(-925.5)
-
MMBtu
02 2.7135: Install occupancy sensors $1,270 $1,850 $1,270
26,100
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $428 $1,867 $428
8,815
kWh
- -
04 2.4225: Install common header on compressors $1,497 $700 $1,019
21,000
kWh
$478
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $480 $250 $296
6,100
kWh
$184
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,226 $21,067 $7,377
152,115
kWh
$2,775
-
kW-mo/yr
$(-925.5)
-
MMBtu
TOTAL IMPLEMENTED $7,529 $17,350 $5,679
117,200
kWh
$2,775
-
kW-mo/yr
$(-925.5)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs