ITAC Assessment: LT0069
ITAC logo
ITAC Assessment: LT0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COUPLINGS
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area
n/a
Annual Production 13,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,964 4,772,861
kWh
Natural Gas $76,681 18,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,700 $1,350 $1,300
40,739
kWh
$400
-
MMBtu
02 2.7229: Air condition only space necessary $590 - $470
15,533
kWh
$120
-
MMBtu
03 2.4133: Use most efficient type of electric motors $2,540 $3,300 $2,540
33,411
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $899 $150 $899
16,120
kWh
-
05 2.6232: Install set-back timers $196 $80 $196
2,052
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,930 $2,160 $1,930
24,912
kWh
-
TOTAL RECOMMENDED $7,855 $7,040 $7,335
132,767
kWh
$520
-
MMBtu
TOTAL IMPLEMENTED $5,729 $4,800 $5,209
105,803
kWh
$520
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs