ITAC Assessment: LT0041
ITAC logo
ITAC Assessment: LT0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PAPER MACHINE CLOTHING
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 1,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,323 2,431,125
kWh
Natural Gas $2,386 485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $350 $100 $350
8,206
kWh
-
02 2.2437: Recover waste heat from equipment $1,397 $1,000 - $1,397
-
MMBtu
03 2.7261: Install timers and/or thermostats $1,008 $450 $1,008
13,482
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $4,080 $264 $4,080
95,838
kWh
-
05 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $1,419 $2,500 $1,419
-
kWh
-
06 2.7422: Plant trees or shrubs near windows to shield from sunlight $400 $990 $400
9,379
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $859 $1,040
20,516
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $650 $42 $650
12,896
kWh
-
TOTAL RECOMMENDED $10,344 $6,205 $8,947
160,317
kWh
$1,397
-
MMBtu
TOTAL IMPLEMENTED $7,528 $2,705 $7,528
160,317
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings