ITAC Assessment: RU0095
ITAC logo
ITAC Assessment: RU0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product INSULATION VAPOR BARRIER
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 450
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,413 2,659,730
kWh
Fuel Oil #2 $162,847 31,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,594 $2,500 $3,594
43,962
kWh
- -
02 2.2136: Install / repair insulation on steam lines $2,404 $72 - $2,404
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $4,881 - - $4,881
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,156 $375 - $4,156
-
MMBtu
-
05 2.2122: Install / repair insulation on condensate lines $454 $269 - $454
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,859 - $2,859
34,877
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $865 $584 $865
10,551
kWh
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $3,140 $4,878 $3,182
38,980
kWh
- $(-42.0)
TOTAL RECOMMENDED $22,353 $8,678 $10,500
128,370
kWh
$11,895
-
MMBtu
$(-42.0)
TOTAL IMPLEMENTED $11,615 $7,378 $6,776
82,942
kWh
$4,881
-
MMBtu
$(-42.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs