ITAC Assessment: MS0339
ITAC logo
ITAC Assessment: MS0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Vehicle Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 350
Plant Area 95,600
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,977 1,979,548
kWh
Electricity Demand $18,446 3,288
kW-mo/yr
Electricity Fees $1,761 -
Natural Gas $42,000 4,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,229 $26,338 $16,954
339,075
kWh
$3,961
-
kW-mo/yr
$314 -
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,499 - - - - $3,499
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,942 $378 $2,899
57,976
kWh
- $43 -
04 2.7124: Make a practice of turning off lights when not needed $1,997 - $1,968
39,358
kWh
- $29 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,576 $1,310 $1,322
26,447
kWh
$231
-
kW-mo/yr
$23 -
06 2.6218: Turn off equipment when not in use $1,334 - $394
7,896
kWh
$920
-
kW-mo/yr
$20 -
TOTAL RECOMMENDED $32,577 $28,026 $23,537
470,752
kWh
$5,112
-
kW-mo/yr
$429 $3,499
-
MMBtu
TOTAL IMPLEMENTED $31,001 $26,716 $22,215
444,305
kWh
$4,881
-
kW-mo/yr
$406 $3,499
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs