ITAC Assessment: LE0346
ITAC logo
ITAC Assessment: LE0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 40,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,548 716,000
kWh
Electricity Demand $8,213 1,821
kW-mo/yr
Natural Gas $19,012 1,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,093 $14,250 $9,902
137,530
kWh
$1,191
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,634 $1,800 - - $1,634
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $10,292 $12,880 $9,187
127,593
kWh
$1,105
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $414 $525 $369
5,125
kWh
$45
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $94 $500 - - $94
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,166 $3,152 $122
1,692
kWh
$7,045
-
kW-mo/yr
-
07 2.7261: Install timers and/or thermostats $129 $109 - - $129
-
MMBtu
TOTAL RECOMMENDED $30,821 $33,216 $19,580
271,940
kWh
$9,385
-
kW-mo/yr
$1,857
-
MMBtu
TOTAL IMPLEMENTED $28,551 $30,282 $19,211
266,815
kWh
$9,340
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs