Assessment Year | 2012 |
---|---|
Principal Product | Valves |
NAICS | 332911: Industrial Valve Manufacturing |
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
40,000
ft2
|
Annual Production | 12,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,548 | 716,000 |
kWh
|
$0.072 |
Electricity Demand | $8,213 | 1,821 |
kW-mo/yr
|
$4.51 |
Natural Gas | $19,012 | 1,626 |
MMBtu
|
$11.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,551 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,093 | $14,250 |
$9,902
137,530
kWh
|
$1,191
-
kW-mo/yr
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,634 | $1,800 | - | - |
$1,634
-
MMBtu
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $10,292 | $12,880 |
$9,187
127,593
kWh
|
$1,105
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $414 | $525 |
$369
5,125
kWh
|
$45
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $94 | $500 | - | - |
$94
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,166 | $3,152 |
$122
1,692
kWh
|
$7,045
-
kW-mo/yr
|
- | |
07 | 2.7261: Install timers and/or thermostats | $129 | $109 | - | - |
$129
-
MMBtu
|
|
TOTAL RECOMMENDED | $30,821 | $33,216 |
$19,580
271,940
kWh
|
$9,385
-
kW-mo/yr
|
$1,857
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,551 | $30,282 |
$19,211
266,815
kWh
|
$9,340
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs