Assessment Year | 2010 |
---|---|
Principal Product | Fire fighting foam |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 16 |
Plant Area |
100,000
ft2
|
Annual Production | 1,000
Tgal
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,851 | 431,036 |
kWh
|
$0.14 |
Natural Gas | $176,783 | 19,009 |
MMBtu
|
$9.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,118 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $21,676 | $250 |
$13,931
98,803
kWh
|
$7,745
-
MMBtu
|
|
02 | 2.1224: Replace boiler | $18,600 | $210,000 | - |
$18,600
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,731 | $12,600 | - |
$10,731
-
MMBtu
|
|
04 | 2.2442: Preheat combustion air with waste heat | $8,965 | $25,000 | - |
$8,965
-
MMBtu
|
|
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $7,842 | $6,180 | - |
$7,842
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,037 | $1,720 |
$2,037
14,446
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,146 | $700 |
$1,146
8,131
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,733 | $7,344 |
$2,733
16,211
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,491 | $7,592 |
$2,491
17,001
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $971 | $14,300 |
$971
6,897
kWh
|
- | |
TOTAL RECOMMENDED | $77,192 | $285,686 |
$23,309
161,489
kWh
|
$53,883
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,118 | $216,430 |
$13,931
98,803
kWh
|
$34,187
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs