ITAC Assessment: LE0308
ITAC logo
ITAC Assessment: LE0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fire fighting foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 100,000
ft2
Annual Production 1,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,851 431,036
kWh
Natural Gas $176,783 19,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $21,676 $250 $13,931
98,803
kWh
$7,745
-
MMBtu
02 2.1224: Replace boiler $18,600 $210,000 - $18,600
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $10,731 $12,600 - $10,731
-
MMBtu
04 2.2442: Preheat combustion air with waste heat $8,965 $25,000 - $8,965
-
MMBtu
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $7,842 $6,180 - $7,842
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,037 $1,720 $2,037
14,446
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $1,146 $700 $1,146
8,131
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,733 $7,344 $2,733
16,211
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,491 $7,592 $2,491
17,001
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $971 $14,300 $971
6,897
kWh
-
TOTAL RECOMMENDED $77,192 $285,686 $23,309
161,489
kWh
$53,883
-
MMBtu
TOTAL IMPLEMENTED $48,118 $216,430 $13,931
98,803
kWh
$34,187
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs