| Assessment Year | 2003 |
|---|---|
| Principal Product | Spherical Bearings |
| NAICS | 332991: Ball and Roller Bearing Manufacturing |
| SIC | 3562: Ball and Roller Bearings |
| Sales Range | n/a |
| # of Employees | 184 |
| Plant Area |
268,000
ft2
|
| Annual Production | 352,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,098,064 | 25,948,309 |
kWh
|
$0.042 |
| Electricity Demand | $438,295 | 45,895 |
kW-mo/yr
|
$9.55 |
| Natural Gas | $411,282 | 70,451 |
MMBtu
|
$5.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $66,994 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,260 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $16,235 | $262 | - | - |
$16,235
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,375 | $48,722 |
$4,321
90,014
kWh
|
$1,423
-
kW-mo/yr
|
- | $5,631 | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $13,320 | $2,000 |
$9,582
199,637
kWh
|
$3,738
-
kW-mo/yr
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,414 | - |
$4,888
101,838
kWh
|
$1,526
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,251 | $200 |
$4,694
97,798
kWh
|
$1,557
-
kW-mo/yr
|
- | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,746 | $750 | - | - |
$5,746
-
MMBtu
|
- | |
| 07 | 2.7261: Install timers and/or thermostats | $3,959 | $1,050 |
$3,959
82,480
kWh
|
- | - | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $2,585 | - |
$2,585
53,865
kWh
|
- | - | - | |
| 09 | 2.7492: Use proper thickness of insulation on building envelope | $656 | - |
$656
13,669
kWh
|
- | - | - | |
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $229 | $1,100 |
$229
5,322
kWh
|
- | - | - | |
| 11 | 2.2136: Install / repair insulation on steam lines | $224 | $80 | - | - |
$224
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $66,994 | $54,164 |
$30,914
644,623
kWh
|
$8,244
-
kW-mo/yr
|
$22,205
-
MMBtu
|
$5,631 | ||
| TOTAL IMPLEMENTED | $47,260 | $52,164 |
$16,444
343,148
kWh
|
$2,980
-
kW-mo/yr
|
$22,205
-
MMBtu
|
$5,631 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs