Assessment Year | 1993 |
---|---|
Principal Product | POWER CABLE FOR PUMPS |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
n/a
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $412,985 | 8,661,489 |
kWh
|
$0.048 |
Natural Gas | $111,696 | 32,723 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,557 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $29,764 | $80,000 |
$40,983
750,000
kWh
|
$(-11,219.0)
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $4,617 | $3,517 | - |
$4,617
-
MMBtu
|
|
03 | 2.6232: Install set-back timers | $3,940 | $1,000 |
$3,940
82,649
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $377 | $200 |
$377
7,913
kWh
|
- | |
05 | 2.1212: Operate boilers on high fire setting | $3,802 | $12,100 | - |
$3,802
-
MMBtu
|
|
06 | 2.4314: Use synthetic lubricant | $3,674 | - |
$3,674
77,081
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,493 | $11,200 |
$3,493
73,271
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $3,395 | $378 |
$3,395
71,219
kWh
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $2,445 | $9,310 |
$2,445
51,290
kWh
|
- | |
10 | 2.7261: Install timers and/or thermostats | $643 | $440 |
$274
5,862
kWh
|
$369
-
MMBtu
|
|
TOTAL RECOMMENDED | $56,150 | $118,145 |
$58,581
1,119,285
kWh
|
$(-2,431.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,557 | $4,517 |
$3,940
82,649
kWh
|
$4,617
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs