ITAC Assessment: KU0402
ITAC logo
ITAC Assessment: KU0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product POWER CABLE FOR PUMPS
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area
n/a
Annual Production 20,000
thousand feet
Production Hrs. Annual 8,520
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,985 8,661,489
kWh
Natural Gas $111,696 32,723
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $29,764 $80,000 $40,983
750,000
kWh
$(-11,219.0)
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $4,617 $3,517 - $4,617
-
MMBtu
03 2.6232: Install set-back timers $3,940 $1,000 $3,940
82,649
kWh
-
04 2.7135: Install occupancy sensors $377 $200 $377
7,913
kWh
-
05 2.1212: Operate boilers on high fire setting $3,802 $12,100 - $3,802
-
MMBtu
06 2.4314: Use synthetic lubricant $3,674 - $3,674
77,081
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,493 $11,200 $3,493
73,271
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $3,395 $378 $3,395
71,219
kWh
-
09 2.4133: Use most efficient type of electric motors $2,445 $9,310 $2,445
51,290
kWh
-
10 2.7261: Install timers and/or thermostats $643 $440 $274
5,862
kWh
$369
-
MMBtu
TOTAL RECOMMENDED $56,150 $118,145 $58,581
1,119,285
kWh
$(-2,431.0)
-
MMBtu
TOTAL IMPLEMENTED $8,557 $4,517 $3,940
82,649
kWh
$4,617
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs