ITAC Assessment: KU0368
ITAC logo
ITAC Assessment: KU0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC FOOD CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,712 9,018,171
kWh
Natural Gas $7,678 1,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,112 $21,000 $10,112
273,154
kWh
-
02 2.2511: Insulate bare equipment $5,425 $6,112 $5,425
146,542
kWh
-
03 2.6232: Install set-back timers $5,403 $5,376 $5,403
145,955
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,931 - $1,931
52,169
kWh
-
05 2.7261: Install timers and/or thermostats $707 - $564
15,240
kWh
$143
-
MMBtu
TOTAL RECOMMENDED $23,578 $32,488 $23,435
633,060
kWh
$143
-
MMBtu
TOTAL IMPLEMENTED $2,638 - $2,495
67,409
kWh
$143
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs