ITAC Assessment: KU0366
ITAC logo
ITAC Assessment: KU0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CONFECTIONERY ITEMS
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 4,500,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,809 2,807,151
kWh
Natural Gas $58,893 15,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $3,148 $6,400 $3,148
69,168
kWh
- -
02 2.7261: Install timers and/or thermostats $1,539 $760 $627
13,775
kWh
$912
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $830 $150 - $830
-
MMBtu
-
04 2.1222: Install turbulators $621 $1,320 - $621
-
MMBtu
-
05 2.1232: Keep boiler tubes clean $559 $450 - $559
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $694 $200 $694
15,240
kWh
- -
07 2.2437: Recover waste heat from equipment $407 $350 - $407
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $267 $75 $267
5,862
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $267 $170 $267
5,862
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $(-45.0) - $56
1,172
kWh
- $(-101.0)
11 2.6232: Install set-back timers $240 $600 $240
5,275
kWh
- -
12 2.2437: Recover waste heat from equipment $133 $200 $133
2,931
kWh
- -
TOTAL RECOMMENDED $8,660 $10,675 $5,432
119,285
kWh
$3,329
-
MMBtu
$(-101.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs