Assessment Year | 1992 |
---|---|
Principal Product | CONFECTIONERY ITEMS |
NAICS |
n/a
|
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 4,500,000
lb
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,809 | 2,807,151 |
kWh
|
$0.046 |
Natural Gas | $58,893 | 15,195 |
MMBtu
|
$3.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,148 | $6,400 |
$3,148
69,168
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $1,539 | $760 |
$627
13,775
kWh
|
$912
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $830 | $150 | - |
$830
-
MMBtu
|
- | |
04 | 2.1222: Install turbulators | $621 | $1,320 | - |
$621
-
MMBtu
|
- | |
05 | 2.1232: Keep boiler tubes clean | $559 | $450 | - |
$559
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $694 | $200 |
$694
15,240
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $407 | $350 | - |
$407
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $267 | $75 |
$267
5,862
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $267 | $170 |
$267
5,862
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $(-45.0) | - |
$56
1,172
kWh
|
- | $(-101.0) | |
11 | 2.6232: Install set-back timers | $240 | $600 |
$240
5,275
kWh
|
- | - | |
12 | 2.2437: Recover waste heat from equipment | $133 | $200 |
$133
2,931
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,660 | $10,675 |
$5,432
119,285
kWh
|
$3,329
-
MMBtu
|
$(-101.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs