ITAC Assessment: KU0354
ITAC logo
ITAC Assessment: KU0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALUMINUM FLASHLIGHTS
NAICS
n/a
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,026 939,918
kWh
Natural Gas $7,334 1,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $7,348 $1,000 $6,092
90,856
kWh
$1,256
-
MMBtu
02 2.2437: Recover waste heat from equipment $988 $705 - $988
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $275 $100 $275
4,103
kWh
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $825 $200 $825
12,309
kWh
-
05 2.6232: Install set-back timers $570 $330 $570
8,499
kWh
-
TOTAL RECOMMENDED $10,006 $2,335 $7,762
115,767
kWh
$2,244
-
MMBtu
TOTAL IMPLEMENTED $10,006 $2,335 $7,762
115,767
kWh
$2,244
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs