ITAC Assessment: OK0239
ITAC logo
ITAC Assessment: OK0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MACHINED PARTS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,288
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,434 560,668
kWh
Natural Gas $14,942 3,406
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $584

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $2,300 $573 - $2,300
-
MMBtu
-
02 2.2511: Insulate bare equipment $140 $360 - $140
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $584 - $684
11,723
kWh
- $(-100.0)
TOTAL RECOMMENDED $3,024 $933 $684
11,723
kWh
$2,440
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $584 - $684
11,723
kWh
- $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs