ITAC Assessment: OR0146
ITAC logo
ITAC Assessment: OR0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RANDOM WIDTH HARDWOOD
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 30,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,434 7,423,798
kWh
Natural Gas $248,996 82,977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $645 - $423
20,809
kWh
- $222
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,041 - $1,041
33,705
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,813 $885 $1,603
54,220
kWh
- $210
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $440 $500 $440
17,585
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $636 $1,000 - $636
-
MMBtu
-
06 2.2123: Insulate feedwater tank $157 $333 - $157
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,119 $5,950 $2,119
86,460
kWh
- -
08 2.4133: Use most efficient type of electric motors $536 $8,869 $536
17,878
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,355 $66,726 $13,355
656,506
kWh
- -
TOTAL RECOMMENDED $20,742 $84,263 $19,517
887,163
kWh
$793
-
MMBtu
$432
TOTAL IMPLEMENTED $4,026 $10,754 $3,180
105,803
kWh
$636
-
MMBtu
$210
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings