Assessment Year | 1992 |
---|---|
Principal Product | RANDOM WIDTH HARDWOOD |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,434 | 7,423,798 |
kWh
|
$0.029 |
Natural Gas | $248,996 | 82,977 |
MMBtu
|
$3.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,026 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $645 | - |
$423
20,809
kWh
|
- | $222 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,041 | - |
$1,041
33,705
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,813 | $885 |
$1,603
54,220
kWh
|
- | $210 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $440 | $500 |
$440
17,585
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $636 | $1,000 | - |
$636
-
MMBtu
|
- | |
06 | 2.2123: Insulate feedwater tank | $157 | $333 | - |
$157
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,119 | $5,950 |
$2,119
86,460
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $536 | $8,869 |
$536
17,878
kWh
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,355 | $66,726 |
$13,355
656,506
kWh
|
- | - | |
TOTAL RECOMMENDED | $20,742 | $84,263 |
$19,517
887,163
kWh
|
$793
-
MMBtu
|
$432 | ||
TOTAL IMPLEMENTED | $4,026 | $10,754 |
$3,180
105,803
kWh
|
$636
-
MMBtu
|
$210 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs