ITAC Assessment: KU0345
ITAC logo
ITAC Assessment: KU0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product GYPSUM
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 0
Plant Area
n/a
Annual Production 1,190
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,725 788,980
kWh
Natural Gas $18,670 5,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.7214: Reduce or eliminate waste $71,400 - - - $71,400
02 2.7441: Replace broken windows and/or window sash $3,220 $1,500 - $3,220
-
MMBtu
-
03 2.4323: Use optimum size and capacity equipment $3,154 $2,200 - $3,154
-
MMBtu
-
04 2.7314: Reduce ventilation air $1,505 $200 $504
9,086
kWh
$1,001
-
MMBtu
-
05 2.2515: Use optimum thickness insulation $374 $600 $374
6,741
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $3,461 $5,300 $3,461
62,427
kWh
- -
07 2.2437: Recover waste heat from equipment $618 $950 - $618
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $715 $300 $715
12,896
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $536 $60 $536
9,672
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,528 $1,000 $1,528
27,550
kWh
- -
11 2.6232: Install set-back timers $796 $950 $796
14,361
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $169 - $276
4,982
kWh
- $(-107.0)
13 2.7121: Utilize daylight whenever possible in lieu of artificial light $439 $1,429 $439
7,913
kWh
- -
14 3.4116: Meter recycled water (to reduce sewer charges) $968 - - - $968
TOTAL RECOMMENDED $88,883 $14,489 $8,629
155,628
kWh
$7,993
-
MMBtu
$72,261
TOTAL IMPLEMENTED $16,515 $14,489 $8,629
155,628
kWh
$7,993
-
MMBtu
$(-107.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs