ITAC Assessment: WI0479
ITAC logo
ITAC Assessment: WI0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic molded parts
NAICS 333511: Industrial Mold Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 40,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,988 4,033,800
kWh
Electricity Demand $101,585 9,854
kW-mo/yr
Electricity Fees $7,214 -
Natural Gas $9,867 1,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7273: Install desiccant humidity control system $16,108 $12,000 $7,034
194,312
kWh
$8,451
-
kW-mo/yr
$623
-
MMBtu
02 2.2621: Modify refrigeration system to operate at a lower pressure $8,744 $18,000 $5,005
138,240
kWh
$3,739
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,122 $11,520 n/a $3,831
105,840
kWh
$2,291
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,229 - - $3,229
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,022 - $1,215
33,570
kWh
$807
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $1,186 $774 $739
20,438
kWh
$447
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $670 $640 $305
8,414
kWh
$365
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $667 $1,020 $667
19,508
kWh
- -
TOTAL RECOMMENDED $38,748 $43,954 $18,796
520,322
kWh
$19,329
-
kW-mo/yr
$623
-
MMBtu
TOTAL IMPLEMENTED $2,022 - $1,215
33,570
kWh
$807
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs