Assessment Year | 1985 |
---|---|
Principal Product | DISTILLED MONOGLYCERIDES |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,279 | 2,845,838 |
kWh
|
$0.060 |
Natural Gas | $198,196 | 60,562 |
MMBtu
|
$3.27 |
Other Energy | $8,000 | 1,136 |
MMBtu
|
$7.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $93,873 | $350,000 |
$126,426
2,100,528
kWh
|
$(-32,553.0)
-
MMBtu
|
- | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $9,544 | $3,342 |
$9,544
158,558
kWh
|
- | - | |
03 | 2.2223: Enhance sensitivity of temperature control and cutoff | $6,350 | $2,500 |
$6,350
105,510
kWh
|
- | - | |
04 | 2.1394: Replace steam jets on vacuum system with electric motor driven vacuum pumps | $1,428 | $2,000 |
$(-900.0)
(-14,947)
kWh
|
$2,328
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,064 | $2,200 | - |
$8,064
-
MMBtu
|
- | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $5,611 | $1,200 | - |
$5,611
-
MMBtu
|
- | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $6,298 | $1,200 | - |
$6,298
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $311 | $187 | - |
$311
-
MMBtu
|
- | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $1,323 | - |
$71
1,172
kWh
|
$1,252
-
MMBtu
|
- | |
10 | 2.8223: Add air shields to trucks to increase fuel mileage | $239 | - | - | - |
$239
-
MMBtu
|
|
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $141 | $40 |
$141
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $133,182 | $362,669 |
$141,632
2,353,166
kWh
|
$(-8,689.0)
-
MMBtu
|
$239
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,517 | $7,942 |
$9,544
158,558
kWh
|
$19,973
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs