ITAC Assessment: MZ0390
ITAC logo
ITAC Assessment: MZ0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product cake, brownie, cookie dry mixes
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 342,000
ft2
Annual Production 162,000,000
lb
Production Hrs. Annual 6,960
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,034,324 28,692,542
kWh
Electricity Demand $308,935 55,570
kW-mo/yr
Natural Gas $115,425 35,367
MMBtu
TOTAL YEARLY COSTS $1,458,684
RECOMMENDED SAVINGS* $67,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,516 $17,100 $23,516
653,220
kWh
- -
02 2.2625: Chill water to the highest temperature possible $8,616 $19,492 $6,878
191,077
kWh
$1,738
-
kW-mo/yr
-
03 2.2625: Chill water to the highest temperature possible $9,218 $13,460 $7,280
202,213
kWh
$1,938
-
kW-mo/yr
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $7,996 $1,600 - - $7,996
-
MMBtu
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $11,755 $46,600 - - $11,755
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,595 $1,000 $3,442
95,623
kWh
$153
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $196 $725 $196
5,457
kWh
- -
08 2.4322: Use or replace with energy efficient substitutes $2,878 $1,700 $2,878
79,938
kWh
- -
TOTAL RECOMMENDED $67,770 $101,677 $44,190
1,227,528
kWh
$3,829
-
kW-mo/yr
$19,751
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs