ITAC Assessment: KU0333
ITAC logo
ITAC Assessment: KU0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product METALS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 64
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,804 1,838,511
kWh
Natural Gas $39,181 9,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5194: Redesign process $1,119 - - $1,119
-
MMBtu
02 2.7261: Install timers and/or thermostats $3,551 $3,600 - $3,551
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $6,970 $20,000 - $6,970
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,825 $4,000 - $3,825
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $153 - $153
2,052
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $2,398 $200 $2,398
32,239
kWh
-
07 2.6232: Install set-back timers $698 $1,000 $698
9,379
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $85 $84 $85
1,172
kWh
-
TOTAL RECOMMENDED $18,799 $28,884 $3,334
44,842
kWh
$15,465
-
MMBtu
TOTAL IMPLEMENTED $18,799 $28,884 $3,334
44,842
kWh
$15,465
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs