ITAC Assessment: KU0225
ITAC logo
ITAC Assessment: KU0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GARDEN & PLASTIC HOSES
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 104,501
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,344 6,584,115
kWh
Natural Gas $25,620 6,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $15,036 $4,546 $16,800
304,513
kWh
$(-1,764.0)
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $8,616 $500 - $8,616
-
MMBtu
-
03 2.2511: Insulate bare equipment $13,017 $8,000 $13,017
235,932
kWh
- -
04 2.6121: Reduce hot water temperature to the minimum required $115 - $115
2,052
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $942 - - $1,042
-
MMBtu
$(-100.0)
06 2.1123: Install automatic stack damper $1,432 $300 - $1,432
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $713 $50 $713
12,896
kWh
- -
08 2.2437: Recover waste heat from equipment $1,280 $800 - $1,280
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $388 $400 $388
7,034
kWh
- -
10 2.7447: Install vinyl strip / high speed / air curtain doors $115 $161 - $115
-
MMBtu
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,035 - $1,035
18,757
kWh
- -
12 2.4312: Improve lubrication practices $6,161 $4,500 $6,161
111,665
kWh
- -
TOTAL RECOMMENDED $48,850 $19,257 $38,229
692,849
kWh
$10,721
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $39,589 $13,257 $31,680
574,150
kWh
$8,009
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs