| Assessment Year | 1986 |
|---|---|
| Principal Product | PNEUMATIC TUBE CONVEYORS |
| NAICS |
n/a
|
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 40
pieces
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,325 | 466,002 |
kWh
|
$0.084 |
| Natural Gas | $15,722 | 3,621 |
MMBtu
|
$4.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,330 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $2,653 | $139 |
$49
586
kWh
|
$2,604
-
MMBtu
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,374 | $14 |
$272
(-3,224)
kWh
|
$3,602
-
MMBtu
|
$(-500.0) | |
| 03 | 2.7314: Reduce ventilation air | $756 | $100 |
$49
586
kWh
|
$707
-
MMBtu
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,705 | - |
$2,205
-
kWh
|
- | $(-500.0) | |
| 05 | 2.7261: Install timers and/or thermostats | $4,203 | $106 |
$223
2,638
kWh
|
$3,980
-
MMBtu
|
- | |
| 06 | 2.6232: Install set-back timers | $1,360 | $222 |
$1,360
16,120
kWh
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $964 | $600 |
$964
11,430
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $148 | $200 |
$148
1,758
kWh
|
- | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $124 | $200 |
$124
1,465
kWh
|
- | - | |
| 10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $229 | - | - |
$299
-
MMBtu
|
$(-70.0) | |
| 11 | 2.1123: Install automatic stack damper | $456 | $700 | - |
$456
-
MMBtu
|
- | |
| 12 | 2.4312: Improve lubrication practices | $495 | $200 |
$495
5,862
kWh
|
- | - | |
| 13 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $272 | - |
$272
3,224
kWh
|
- | - | |
| 14 | 2.6121: Reduce hot water temperature to the minimum required | $122 | - | - |
$122
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $16,861 | $2,481 |
$6,161
40,445
kWh
|
$11,770
-
MMBtu
|
$(-1,070.0) | ||
| TOTAL IMPLEMENTED | $13,330 | $2,242 |
$6,063
39,273
kWh
|
$8,337
-
MMBtu
|
$(-1,070.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs