Assessment Year | 1985 |
---|---|
Principal Product | SOFT DRINKS-BOTTLES&CANS |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 34 |
Plant Area |
n/a
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,856 | 1,992,087 |
kWh
|
$0.072 |
Natural Gas | $62,171 | 15,364 |
MMBtu
|
$4.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,100 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $14,225 | $10 |
$212
2,931
kWh
|
$14,013
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,915 | $3,542 |
$3,915
54,220
kWh
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,185 | $300 |
$1,185
16,413
kWh
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $711 | $500 |
$711
9,965
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,705 | - | - |
$1,705
-
MMBtu
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,397 | $2,000 | - |
$1,397
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $2,651 | $1,952 |
$3,153
43,669
kWh
|
$(-502.0)
-
MMBtu
|
- | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $2,912 | - | - |
$2,912
-
MMBtu
|
- | |
09 | 2.1123: Install automatic stack damper | $2,256 | $1,600 | - |
$2,256
-
MMBtu
|
- | |
10 | 2.2511: Insulate bare equipment | $698 | $1,500 |
$783
10,844
kWh
|
$(-85.0)
-
MMBtu
|
- | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $423 | $50 |
$423
5,862
kWh
|
- | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $423 | $215 |
$423
5,862
kWh
|
- | - | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $360 | $120 |
$360
4,982
kWh
|
- | - | |
14 | 2.4312: Improve lubrication practices | $466 | $250 |
$466
6,448
kWh
|
- | - | |
15 | 2.7441: Replace broken windows and/or window sash | $498 | $200 | - |
$498
-
MMBtu
|
- | |
16 | 2.1233: Analyze flue gas for proper air/fuel ratio | $446 | - | - |
$846
-
MMBtu
|
$(-400.0) | |
17 | 2.2511: Insulate bare equipment | $192 | $75 |
$212
2,931
kWh
|
$(-20.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,463 | $12,314 |
$11,843
164,127
kWh
|
$23,020
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $25,100 | $8,174 |
$9,248
128,077
kWh
|
$16,252
-
MMBtu
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs