| Assessment Year | 1984 |
|---|---|
| Principal Product | FOLDING CARTONS |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 12,500
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $71,083 | 1,060,961 |
kWh
|
$0.067 |
| Natural Gas | $33,125 | 7,081 |
MMBtu
|
$4.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,377 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,748 | - |
$1,748
26,084
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $177 | $250 |
$177
2,638
kWh
|
- | |
| 03 | 2.6232: Install set-back timers | $1,100 | - |
$1,100
16,413
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $1,807 | $200 |
$1,807
26,964
kWh
|
- | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $1,535 | $2,500 | - |
$1,535
-
MMBtu
|
|
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $314 | - |
$314
4,689
kWh
|
- | |
| 07 | 2.4312: Improve lubrication practices | $4,026 | $1,000 |
$4,026
60,082
kWh
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,100 | $450 |
$1,100
16,413
kWh
|
- | |
| 10 | 2.1123: Install automatic stack damper | $2,518 | $1,600 | - |
$2,518
-
MMBtu
|
|
| 11 | 2.7261: Install timers and/or thermostats | $661 | - |
$628
9,379
kWh
|
$33
-
MMBtu
|
|
| 12 | 2.6124: Establish equipment maintenance schedule | $884 | $120 |
$884
13,189
kWh
|
- | |
| 13 | 2.6121: Reduce hot water temperature to the minimum required | $112 | - | - |
$112
-
MMBtu
|
|
| TOTAL RECOMMENDED | $15,982 | $6,120 |
$11,784
175,851
kWh
|
$4,198
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,377 | $570 |
$6,344
94,667
kWh
|
$33
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs