ITAC Assessment: KU0138
ITAC logo
ITAC Assessment: KU0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FOLDING CARTONS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 12,500
ton
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,083 1,060,961
kWh
Natural Gas $33,125 7,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,377

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,748 - $1,748
26,084
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $177 $250 $177
2,638
kWh
-
03 2.6232: Install set-back timers $1,100 - $1,100
16,413
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $1,807 $200 $1,807
26,964
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $1,535 $2,500 - $1,535
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $314 - $314
4,689
kWh
-
07 2.4312: Improve lubrication practices $4,026 $1,000 $4,026
60,082
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $1,100 $450 $1,100
16,413
kWh
-
10 2.1123: Install automatic stack damper $2,518 $1,600 - $2,518
-
MMBtu
11 2.7261: Install timers and/or thermostats $661 - $628
9,379
kWh
$33
-
MMBtu
12 2.6124: Establish equipment maintenance schedule $884 $120 $884
13,189
kWh
-
13 2.6121: Reduce hot water temperature to the minimum required $112 - - $112
-
MMBtu
TOTAL RECOMMENDED $15,982 $6,120 $11,784
175,851
kWh
$4,198
-
MMBtu
TOTAL IMPLEMENTED $6,377 $570 $6,344
94,667
kWh
$33
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs