Assessment Year | 2016 |
---|---|
Principal Product | Magazine, Poster, and Book Printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
275,000
ft2
|
Annual Production | 172,600,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,256 | 4,639,680 |
kWh
|
$0.046 |
Electricity Demand | $283,002 | 15,382 |
kW-mo/yr
|
$18.40 |
Electricity Fees | $5,908 | - |
|
- |
Natural Gas | $99,322 | 16,611 |
MMBtu
|
$5.98 |
TOTAL YEARLY COSTS | $601,488 | |||
RECOMMENDED SAVINGS* | $82,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,924 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $36,855 | $47,256 | - | - |
$36,855
-
MMBtu
|
- | - | |
02 | 2.2442: Preheat combustion air with waste heat | $21,755 | $55,980 | - | - |
$21,755
-
MMBtu
|
- | - | |
03 | 4.631: Install an uninteruptable power supply | $12,000 | $3,000 | - | - | - | $2,000 | $10,000 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $840 | - |
$840
18,261
kWh
|
- | - | - | - | |
05 | 2.7224: Reduce space conditioning during non-working hours | $5,216 | $1,200 |
$2,944
64,000
kWh
|
- |
$2,272
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,906 | $2,760 |
$4,906
106,655
kWh
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $735 | - |
$735
15,977
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $227 | $412 |
$147
3,189
kWh
|
$80
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $82,534 | $110,608 |
$9,572
208,082
kWh
|
$80
-
kW-mo/yr
|
$60,882
-
MMBtu
|
$2,000 | $10,000 | ||
TOTAL IMPLEMENTED | $23,924 | $7,372 |
$9,572
208,082
kWh
|
$80
-
kW-mo/yr
|
$2,272
-
MMBtu
|
$2,000 | $10,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs