ITAC Assessment: LE0243
ITAC logo
ITAC Assessment: LE0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product hollow fiber membrane modules
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824: Manmade Organic Fibers, Except Cellulosic
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 200,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,545 7,314,330
kWh
Electricity Demand $193,392 17,673
kW-mo/yr
Natural Gas $654,101 62,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $316,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2423: Install waste heat boiler to produce steam $193,808 $200,000 - - - $193,808
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $28,291 $86,000 $12,905
358,445
kWh
$5,386
-
kW-mo/yr
$10,000 -
03 2.7226: Use computer programs to optimize hvac performance $27,533 $20,000 $14,875
413,112
kWh
$12,658
-
kW-mo/yr
- -
04 2.7229: Air condition only space necessary $27,306 $200 $19,351
537,522
kWh
$7,955
-
kW-mo/yr
- -
05 2.7292: Lower ceiling to reduce conditioned space $18,286 $50,000 $12,901
358,351
kWh
$5,385
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $8,730 $2,400 $6,197
172,140
kWh
$2,533
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,824 $80 $4,275
118,741
kWh
$2,549
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,925 $2,000 $1,825
50,684
kWh
$1,100
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $995 $525 $995
27,631
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,687 $7,500 $637
17,680
kWh
$1,050
-
kW-mo/yr
- -
TOTAL RECOMMENDED $316,385 $368,705 $73,961
2,054,306
kWh
$38,616
-
kW-mo/yr
$10,000 $193,808
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs