ITAC Assessment: KU0137
ITAC logo
ITAC Assessment: KU0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product BOOKS
NAICS
n/a
SIC 2732: Book Printing
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 3,328
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,213 725,088
kWh
Natural Gas $12,551 2,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4157: Replace water cooling on processes with air cooling $4,772 $4,500 $424
5,275
kWh
$68
-
MMBtu
$4,280
02 2.7261: Install timers and/or thermostats $3,839 - $2,588
32,239
kWh
$1,251
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $2,293 - - $2,293
-
MMBtu
-
04 2.7441: Replace broken windows and/or window sash $250 $90 $24
293
kWh
$226
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,930 - $1,930
24,033
kWh
- -
06 2.3191: Use demand controller or load shedder $1,472 $2,000 $1,472
-
kWh
- -
07 2.7444: Close holes and openings in building such as broken windows $1,169 $400 $682
8,499
kWh
$487
-
MMBtu
-
08 2.5196: Use small number of high output units instead of many small inefficient units $1,200 $1,670 $1,200
14,947
kWh
- -
09 2.2511: Insulate bare equipment $754 $750 $447
5,569
kWh
$307
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $471 $20 $471
5,862
kWh
- -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $235 $50 $235
2,931
kWh
- -
13 2.6121: Reduce hot water temperature to the minimum required $212 - $212
2,638
kWh
- -
14 2.6121: Reduce hot water temperature to the minimum required $118 - $118
1,465
kWh
- -
15 2.4221: Install compressor air intakes in coolest locations $118 $40 $118
1,465
kWh
- -
TOTAL RECOMMENDED $18,833 $9,520 $9,921
105,216
kWh
$4,632
-
MMBtu
$4,280
TOTAL IMPLEMENTED $6,122 $50 $4,871
60,668
kWh
$1,251
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs