ITAC Assessment: OK0915
ITAC logo
ITAC Assessment: OK0915
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aircraft manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 411
Plant Area 356,250
ft2
Annual Production 2,263,800
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,518 10,078,080
kWh
Electricity Demand $298,320 23,773
kW-mo/yr
Natural Gas $40,592 4,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $58,176 $103,015 $45,908
752,589
kWh
$12,268
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $17,688 $25,096 $17,688
289,961
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,867 $20,538 $4,947
81,099
kWh
$1,920
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,060 $24,180 $6,060
99,341
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,077 $6,900 $10,077
165,189
kWh
- - - -
06 2.4226: Use / purchase optimum sized compressor $7,439 $14,107 $7,439
121,946
kWh
- - - -
07 2.4221: Install compressor air intakes in coolest locations $674 $382 $674
11,049
kWh
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $4,441 $14,342 $4,441
72,796
kWh
- - - -
09 2.4322: Use or replace with energy efficient substitutes $6,741 $3,938 $6,741
110,501
kWh
- - - -
10 2.7232: Replace existing hvac unit with high efficiency model $8,266 $63,126 $8,266
135,505
kWh
- - - -
11 2.7211: Clean and maintain refrigerant condensers and towers $1,720 $3,060 $4,780
78,355
kWh
- - - $(-3,060.0)
12 2.2491: Use cooling air which cools hot work pieces for space heating $2,345 $5,403 $154
2,532
kWh
$552
-
kW-mo/yr
- $1,639
-
MMBtu
-
13 2.2491: Use cooling air which cools hot work pieces for space heating $12,313 $21,480 $8,473
138,905
kWh
$3,840
-
kW-mo/yr
- - -
14 2.3212: Optimize plant power factor $9,371 $14,014 - - $9,371 - -
TOTAL RECOMMENDED $152,178 $319,581 $125,648
2,059,768
kWh
$18,580
-
kW-mo/yr
$9,371 $1,639
-
MMBtu
$(-3,060.0)
TOTAL IMPLEMENTED $83,574 $158,075 $72,446
1,187,622
kWh
$14,188
-
kW-mo/yr
- - $(-3,060.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs