Assessment Year | 1992 |
---|---|
Principal Product | UPHOLSTERY, FABRIC |
NAICS |
n/a
|
SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 21,000
thousand feet
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $448,714 | 6,505,276 |
kWh
|
$0.069 |
Natural Gas | $38,320 | 6,447 |
MMBtu
|
$5.94 |
Fuel Oil #2 | $54,466 | 10,994 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,985 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $5,157 | $567 |
$5,157
74,736
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,827 | $1,646 |
$27,485
398,300
kWh
|
- | - | $(-1,658.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,828 | - |
$2,828
41,032
kWh
|
- | - | - | |
04 | 2.2122: Install / repair insulation on condensate lines | $3,526 | $409 | - |
$1,321
-
MMBtu
|
$2,205
-
MMBtu
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $8,390 | $11,500 | - |
$3,143
-
MMBtu
|
$5,247
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,117 | $322 | - |
$1,222
-
MMBtu
|
$1,895
-
MMBtu
|
- | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $21,144 | $10,000 |
$21,144
306,565
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $69,989 | $24,444 |
$56,614
820,633
kWh
|
$5,686
-
MMBtu
|
$9,347
-
MMBtu
|
$(-1,658.0) | ||
TOTAL IMPLEMENTED | $7,985 | $567 |
$7,985
115,768
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs