Assessment Year | 2009 |
---|---|
Principal Product | packing list envelops |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 30,000,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $361,899 | 3,127,258 |
kWh
|
$0.12 |
Electricity Demand | $78,219 | 9,055 |
kW-mo/yr
|
$8.64 |
Natural Gas | $230,832 | 16,727 |
MMBtu
|
$13.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,926 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3134: Shift from daytime to nighttime operation | $20,166 | $9,360 | - |
$20,166
-
kW-mo/yr
|
- | - | |
02 | 2.5195: Change product design to reduce energy requirements | $15,000 | $40,000 | - | - | - | $15,000 | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,875 | $10,000 |
$3,524
312,000
kWh
|
- |
$9,351
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,170 | $1,152 |
$4,928
43,784
kWh
|
$1,242
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,022 | $800 |
$1,568
14,049
kWh
|
$454
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,998 | $192 |
$1,594
14,178
kWh
|
$404
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,833 | $350 |
$1,478
13,007
kWh
|
$355
-
kW-mo/yr
|
- | - | |
08 | 2.2625: Chill water to the highest temperature possible | $1,174 | $100 |
$937
8,320
kWh
|
$237
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,921 | $25,494 |
$14,628
115,719
kWh
|
$3,293
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $79,159 | $87,448 |
$28,657
521,057
kWh
|
$26,151
-
kW-mo/yr
|
$9,351
-
MMBtu
|
$15,000 | ||
TOTAL IMPLEMENTED | $22,926 | $26,136 |
$18,637
151,224
kWh
|
$4,289
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs