ITAC Assessment: KU0121
ITAC logo
ITAC Assessment: KU0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product COMM. LIGHTING FIXTURES
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 125,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,759 282,532
kWh
Natural Gas $28,220 5,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $8,835 - - $8,835
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $376 $200 $239
2,345
kWh
$137
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,383 $2,250 $4,383
43,083
kWh
- -
04 2.2511: Insulate bare equipment $3,959 $1,000 - $3,959
-
MMBtu
-
05 2.2514: Cover open tanks $2,396 $4,000 - $2,396
-
MMBtu
-
06 2.7441: Replace broken windows and/or window sash $2,034 $738 - $2,034
-
MMBtu
-
07 2.2212: Use minimum safe oven ventilation $474 - $388
3,810
kWh
$1,436
-
MMBtu
$(-1,350.0)
08 2.6212: Turn off equipment during breaks, reduce operating time $1,132 - - $1,132
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $835 $1,200 $835
8,206
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $447 $215 $447
4,396
kWh
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $298 $100 $298
2,931
kWh
- -
12 2.6121: Reduce hot water temperature to the minimum required $118 - - $118
-
MMBtu
-
TOTAL RECOMMENDED $25,287 $9,703 $6,590
64,771
kWh
$20,047
-
MMBtu
$(-1,350.0)
TOTAL IMPLEMENTED $20,818 $5,288 $5,904
58,030
kWh
$16,264
-
MMBtu
$(-1,350.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs