ITAC Assessment: KU0093
ITAC logo
ITAC Assessment: KU0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TOOLS FOR CONCRETE
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 151
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 4,175
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,230 2,307,444
kWh
Natural Gas $45,164 8,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Paper Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,313 $35,000 $15,313
217,761
kWh
- -
02 2.7444: Close holes and openings in building such as broken windows $7,691 $300 - $7,691
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $5,773 $3,300 - $5,773
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $140 $500 $140
2,052
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,642 $750 $2,642
37,515
kWh
- -
06 2.1123: Install automatic stack damper $442 $300 - $442
-
MMBtu
-
07 2.1123: Install automatic stack damper $3,591 $4,600 - $3,591
-
MMBtu
-
08 2.1231: Establish burner maintenance schedule for boilers $4,043 $1,440 - $4,043
-
MMBtu
-
09 3.6121: Burn waste paper for heat $16,658 $58,000 - $21,140
-
MMBtu
$(-4,482.0)
-
MMBtu
10 2.6121: Reduce hot water temperature to the minimum required $356 - - $356
-
MMBtu
-
TOTAL RECOMMENDED $56,649 $104,190 $18,095
257,328
kWh
$43,036
-
MMBtu
$(-4,482.0)
-
MMBtu
TOTAL IMPLEMENTED $9,806 $8,200 - $9,806
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Paper Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs