ITAC Assessment: KU0089
ITAC logo
ITAC Assessment: KU0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,248 2,190,797
kWh
Natural Gas $10,377 2,222
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,514

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $7,499 $24,000 - $7,499
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $7,163 $100 $3,776
84,994
kWh
$3,387
-
MMBtu
03 2.7261: Install timers and/or thermostats $2,999 $200 - $2,999
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,058 $2,580 - $4,058
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,992 $2,970 $2,992
67,409
kWh
-
06 2.2121: Increase amount of condensate returned $1,182 $1,044 - $1,182
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $322 $550 - $322
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $182 - $182
4,103
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $117 $170 $117
2,638
kWh
-
TOTAL RECOMMENDED $26,514 $31,614 $7,067
159,144
kWh
$19,447
-
MMBtu
TOTAL IMPLEMENTED $26,514 $31,614 $7,067
159,144
kWh
$19,447
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs