ITAC Assessment: SF0208
ITAC logo
ITAC Assessment: SF0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Bakery Flour
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 30,000
ft2
Annual Production 180,000
ton
Production Hrs. Annual 7,448
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,068 11,329,455
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,166 - $2,166
34,497
kWh
-
02 2.6218: Turn off equipment when not in use $641 - $641
9,192
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $25,797 $7,615 $25,797
369,487
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,718 $776 $1,718
24,636
kWh
-
05 2.7135: Install occupancy sensors $1,112 $1,080 $1,112
15,946
kWh
-
06 2.4133: Use most efficient type of electric motors $2,331 $3,565 $2,331
33,442
kWh
-
07 2.7132: Install timers on light switches in little used areas $1,971 $4,170 $1,971
28,260
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $804 $1,359 $804
11,532
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $3,295 $9,000 $3,295
47,235
kWh
-
10 3.5217: Reuse / recycle/ sell paper products $1,230 $90 - $1,230
-
lb
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,234 $15,374 - $7,234
-
lb
TOTAL RECOMMENDED $48,299 $43,029 $39,835
574,227
kWh
$8,464
-
lb
TOTAL IMPLEMENTED $9,416 $8,601 $8,186
120,835
kWh
$1,230
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs