ITAC Assessment: KU0068
ITAC logo
ITAC Assessment: KU0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 514,000
thousand feet
Production Hrs. Annual 6,048
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,230 4,216,882
kWh
Natural Gas $163,049 54,158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,263 $6,058 $20,263
351,407
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $12,920 $6,931 - $12,920
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $4,647 $20,000 - $4,647
-
MMBtu
04 2.7261: Install timers and/or thermostats $3,656 $149 $678
11,723
kWh
$2,978
-
MMBtu
05 2.3212: Optimize plant power factor $3,507 $1,685 $3,507
-
kWh
-
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,291 - $1,291
22,274
kWh
-
07 2.7314: Reduce ventilation air $3,114 - $2,222
38,687
kWh
$892
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,464 - $1,464
25,498
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $575 $358 $575
9,965
kWh
-
TOTAL RECOMMENDED $51,437 $35,181 $30,000
459,554
kWh
$21,437
-
MMBtu
TOTAL IMPLEMENTED $45,568 $35,181 $25,023
373,095
kWh
$20,545
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs