| Assessment Year | 1982 |
|---|---|
| Principal Product | POLYETHYLENE PACKAGING |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 95 |
| Plant Area |
n/a
|
| Annual Production | 6,250,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,363 | 1,681,419 |
kWh
|
$0.042 |
| Natural Gas | $13,178 | 4,048 |
MMBtu
|
$3.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,740 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $4,789 | $5,000 | - |
$4,789
-
MMBtu
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $246 | $304 |
$246
5,862
kWh
|
- | |
| 03 | 2.3212: Optimize plant power factor | $4,740 | $1,940 |
$4,740
-
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $1,874 | $600 |
$1,238
29,601
kWh
|
$636
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,110 | $3,248 |
$3,110
74,443
kWh
|
- | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,469 | $1,543 | - |
$1,469
-
MMBtu
|
|
| 07 | 2.7292: Lower ceiling to reduce conditioned space | $792 | $500 | - |
$792
-
MMBtu
|
|
| 08 | 2.4322: Use or replace with energy efficient substitutes | $4,812 | $7,480 |
$4,812
115,182
kWh
|
- | |
| TOTAL RECOMMENDED | $21,832 | $20,615 |
$14,146
225,088
kWh
|
$7,686
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,740 | $1,940 |
$4,740
-
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs