Assessment Year | 2006 |
---|---|
Principal Product | ATV |
NAICS | 336991: Motorcycle, Bicycle, and Parts Manufacturing |
SIC | 3750: |
Sales Range | greater than $500 M |
# of Employees | 1,800 |
Plant Area |
400,000
ft2
|
Annual Production | 275,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $906,190 | 27,502,794 |
kWh
|
$0.033 |
Electricity Demand | $548,808 | 53,731 |
kW-mo/yr
|
$10.21 |
Electricity Fees | $119,323 | - |
|
- |
Natural Gas | $534,170 | 44,780 |
MMBtu
|
$11.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $150,323 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $95,564 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7251: Reduce air conditioning load by evaporating water from roof | $63,286 | $175,000 |
$19,307
585,046
kWh
|
$23,646
-
kW-mo/yr
|
- | $22,333 |
$(-2,000.0)
-
Tgal
|
|
02 | 2.2437: Recover waste heat from equipment | $54,759 | $18,800 | - | - |
$54,759
-
MMBtu
|
- | - | |
03 | 2.4131: Size electric motors for peak operating efficiency | $2,391 | $2,500 |
$1,477
44,760
kWh
|
$914
-
kW-mo/yr
|
- | - | - | |
04 | 2.4237: Substitute compressed air cooling with water or air cooling | $20,374 | $75,000 |
$14,309
433,620
kWh
|
$6,065
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $8,416 | $16,843 |
$5,562
168,532
kWh
|
$2,854
-
kW-mo/yr
|
- | - | - | |
06 | 2.2514: Cover open tanks | $1,097 | $1,600 |
$726
22,012
kWh
|
$371
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $150,323 | $289,743 |
$41,381
1,253,970
kWh
|
$33,850
-
kW-mo/yr
|
$54,759
-
MMBtu
|
$22,333 |
$(-2,000.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $95,564 | $270,943 |
$41,381
1,253,970
kWh
|
$33,850
-
kW-mo/yr
|
- | $22,333 |
$(-2,000.0)
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs