ITAC Assessment: NC0338
ITAC logo
ITAC Assessment: NC0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product ATV
NAICS 336991: Motorcycle, Bicycle, and Parts Manufacturing
SIC 3750:
Sales Range greater than $500
M
# of Employees 1,800
Plant Area 400,000
ft2
Annual Production 275,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $906,190 27,502,794
kWh
Electricity Demand $548,808 53,731
kW-mo/yr
Electricity Fees $119,323 -
Natural Gas $534,170 44,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.7251: Reduce air conditioning load by evaporating water from roof $63,286 $175,000 $19,307
585,046
kWh
$23,646
-
kW-mo/yr
- $22,333 $(-2,000.0)
-
Tgal
02 2.2437: Recover waste heat from equipment $54,759 $18,800 - - $54,759
-
MMBtu
- -
03 2.4131: Size electric motors for peak operating efficiency $2,391 $2,500 $1,477
44,760
kWh
$914
-
kW-mo/yr
- - -
04 2.4237: Substitute compressed air cooling with water or air cooling $20,374 $75,000 $14,309
433,620
kWh
$6,065
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $8,416 $16,843 $5,562
168,532
kWh
$2,854
-
kW-mo/yr
- - -
06 2.2514: Cover open tanks $1,097 $1,600 $726
22,012
kWh
$371
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $150,323 $289,743 $41,381
1,253,970
kWh
$33,850
-
kW-mo/yr
$54,759
-
MMBtu
$22,333 $(-2,000.0)
-
Tgal
TOTAL IMPLEMENTED $95,564 $270,943 $41,381
1,253,970
kWh
$33,850
-
kW-mo/yr
- $22,333 $(-2,000.0)
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs