ITAC Assessment: KU0051
ITAC logo
ITAC Assessment: KU0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HAULING EQUIPMENT
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 15
pieces
Production Hrs. Annual 2,024
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,399 407,386
kWh
Natural Gas $7,328 2,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,382 $3,798 $1,382
29,015
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,642 $574 - $1,642
-
MMBtu
03 2.7261: Install timers and/or thermostats $1,685 $1,000 - $1,685
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $692 $1,290 - $692
-
MMBtu
05 2.7225: Close outdoor air dampers during warm-up / cool-down periods $178 $40 $55
1,172
kWh
$123
-
MMBtu
06 2.6124: Establish equipment maintenance schedule $153 $80 $153
3,224
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $125 - $125
2,638
kWh
-
TOTAL RECOMMENDED $5,857 $6,782 $1,715
36,049
kWh
$4,142
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs