ITAC Assessment: IA0102
ITAC logo
ITAC Assessment: IA0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product electronic controls
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 68,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,448
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,724 2,348,183
kWh
Natural Gas $10,037 2,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,494 $1,840 $1,494
35,170
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,055 $300 $1,055
24,912
kWh
-
03 2.2437: Recover waste heat from equipment $1,169 $850 - $1,169
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $861 $175 $861
20,223
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $342 $700 $342
8,206
kWh
-
06 2.7261: Install timers and/or thermostats $689 $130 $494
11,723
kWh
$195
-
MMBtu
TOTAL RECOMMENDED $5,610 $3,995 $4,246
100,234
kWh
$1,364
-
MMBtu
TOTAL IMPLEMENTED $3,410 $2,315 $3,410
80,305
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs