ITAC Assessment: UD0883
ITAC logo
ITAC Assessment: UD0883
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Contract manufacturer primarily circuits and cables
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 42,000
ft2
Annual Production 280,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,120 778,195
kWh
Electricity Demand $16,388 3,348
kW-mo/yr
Natural Gas $6,716 711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $2,161 $2,100 $1,966
27,648
kWh
- $195 -
02 2.7135: Install occupancy sensors $104 $90 $98
1,382
kWh
- $6 -
03 2.6218: Turn off equipment when not in use $1,986 - $1,986
25,750
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $521 - $408
5,289
kWh
$113
-
kW-mo/yr
- -
05 2.9114: Use solar heat to make electricty $14,883 $105,000 $7,263
74,108
kWh
- - $7,620
TOTAL RECOMMENDED $19,655 $107,190 $11,721
134,177
kWh
$113
-
kW-mo/yr
$201 $7,620
TOTAL IMPLEMENTED $4,772 $2,190 $4,458
60,069
kWh
$113
-
kW-mo/yr
$201 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs