ITAC Assessment: IA0115
ITAC logo
ITAC Assessment: IA0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product athletic jackets and hats
NAICS
n/a
SIC 2353: Hats, Caps, and Millinery
Sales Range $50
M
to 100
M
# of Employees 677
Plant Area 450,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 3,680
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,128 7,427,315
kWh
Natural Gas $36,873 9,501
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $17,919 - $14,111
262,016
kWh
$3,808
-
MMBtu
02 2.2621: Modify refrigeration system to operate at a lower pressure $8,223 $8,195 $8,223
152,696
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,759 $405 $1,759
32,532
kWh
-
04 2.7135: Install occupancy sensors $1,119 $1,686 $1,119
20,809
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,982 $1,090 $1,982
36,928
kWh
-
06 2.7231: Use radiant heater for spot heating $894 $1,050 $1,085
20,223
kWh
$(-191.0)
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $367 $194 - $367
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $223 $25 $223
4,103
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $114 $105 $114
2,052
kWh
-
TOTAL RECOMMENDED $32,600 $12,750 $28,616
531,359
kWh
$3,984
-
MMBtu
TOTAL IMPLEMENTED $23,002 $3,206 $19,194
356,388
kWh
$3,808
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs