ITAC Assessment: CO0453
ITAC logo
ITAC Assessment: CO0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product energy management controls
NAICS
n/a
SIC 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 110,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,478
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,398 4,240,914
kWh
Electricity Demand $35,690 8,888
kW-mo/yr
Electricity Fees $74,148 -
Natural Gas $7,357 1,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $5,250 $1,380 $5,250
156,800
kWh
- - -
02 2.3191: Use demand controller or load shedder $5,130 $10,000 - $5,130
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $2,380 $2,150 - - $2,380
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $800 $240 $1,010
25,498
kWh
$570
-
kW-mo/yr
- $(-780.0)
05 2.7111: Reduce illumination to minimum necessary levels $670 $320 $460
11,430
kWh
$210
-
kW-mo/yr
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $320 $890 $210
4,103
kWh
$110
-
kW-mo/yr
- -
TOTAL RECOMMENDED $14,550 $14,980 $6,930
197,831
kWh
$6,020
-
kW-mo/yr
$2,380
-
MMBtu
$(-780.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs