Assessment Year | 1982 |
---|---|
Principal Product | MECHANICAL EQUIQMENT |
NAICS |
n/a
|
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 2,600
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,657 | 4,542,204 |
kWh
|
$0.052 |
Natural Gas | $49,509 | 19,588 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,933 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59,143 | $92,496 |
$59,143
1,130,715
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $6,923 | $4,000 |
$687
13,189
kWh
|
$6,236
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,715 | $500 | - |
$4,715
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,075 | $3,000 | - |
$2,075
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $955 | $340 |
$955
18,171
kWh
|
- | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $309 | $60 | - |
$309
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,120 | $100,396 |
$60,785
1,162,075
kWh
|
$13,335
-
MMBtu
|
||
TOTAL IMPLEMENTED | $65,933 | $95,996 |
$59,143
1,130,715
kWh
|
$6,790
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs