ITAC Assessment: KU0044
ITAC logo
ITAC Assessment: KU0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MECHANICAL EQUIQMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 2,600
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,657 4,542,204
kWh
Natural Gas $49,509 19,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $59,143 $92,496 $59,143
1,130,715
kWh
-
02 2.7261: Install timers and/or thermostats $6,923 $4,000 $687
13,189
kWh
$6,236
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $4,715 $500 - $4,715
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,075 $3,000 - $2,075
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $955 $340 $955
18,171
kWh
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $309 $60 - $309
-
MMBtu
TOTAL RECOMMENDED $74,120 $100,396 $60,785
1,162,075
kWh
$13,335
-
MMBtu
TOTAL IMPLEMENTED $65,933 $95,996 $59,143
1,130,715
kWh
$6,790
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs