ITAC Assessment: KU0043
ITAC logo
ITAC Assessment: KU0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PLASTIC BOTTLES
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 13,800,000
lb
Production Hrs. Annual 6,077
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $753,766 15,089,684
kWh
Natural Gas $36,216 12,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,438 $2,000 $10,438
208,968
kWh
-
02 2.7261: Install timers and/or thermostats $4,890 $4,800 $2,804
56,272
kWh
$2,086
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $8,989 $550 $8,989
179,953
kWh
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $162,065 $20,000 $162,065
3,244,431
kWh
-
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $20,364 $40,000 $20,364
407,679
kWh
-
06 2.7444: Close holes and openings in building such as broken windows $3,332 $818 - $3,332
-
MMBtu
TOTAL RECOMMENDED $210,078 $68,168 $204,660
4,097,303
kWh
$5,418
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs