ITAC Assessment: IC0053
ITAC logo
ITAC Assessment: IC0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Corrugated Sheets
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 107,000
ft2
Annual Production 107
thousand feet
Production Hrs. Annual 6,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,446 2,798,121
kWh
Electricity Demand $24,224 6,655
kW-mo/yr
Electricity Fees $727 -
Natural Gas $110,063 43,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $276,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,095 $5,808 $1,297
19,913
kWh
$304
-
kW-mo/yr
- - $10 $484
02 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $2,090 $787
12,103
kWh
$80
-
kW-mo/yr
- - - $83
03 2.4322: Use or replace with energy efficient substitutes $961 $1,069 $473
7,274
kWh
$488
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $4,526 $2,954 $4,102
63,106
kWh
$424
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,409 - $1,244
19,142
kWh
$165
-
kW-mo/yr
- - - -
06 2.2135: Repair and eliminate steam leaks $10,710 $2,925 - - $10,710
-
MMBtu
- - -
07 2.2136: Install / repair insulation on steam lines $392 $849 - - $392
-
MMBtu
- - -
08 2.2136: Install / repair insulation on steam lines $1,772 $4,314 - - $1,772
-
MMBtu
- - -
09 2.4322: Use or replace with energy efficient substitutes $5,011 $30,665 $4,541
69,862
kWh
$470
-
kW-mo/yr
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $17,908 $44,545 $15,184
233,597
kWh
$1,570
-
kW-mo/yr
- - $810 $344
11 3.1191: Change procedures / equipment / operating conditions $8,604 $13,918 - - - $8,604
-
Tgal
- -
12 4.451: Add additional production shift $261,630 $35,000 - - - - $261,630 -
TOTAL RECOMMENDED $315,968 $144,137 $27,628
424,997
kWh
$3,501
-
kW-mo/yr
$12,874
-
MMBtu
$8,604
-
Tgal
$262,450 $911
TOTAL IMPLEMENTED $276,874 $44,157 $1,717
26,416
kWh
$653
-
kW-mo/yr
$12,874
-
MMBtu
- $261,630 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs