ITAC Assessment: LE0420
ITAC logo
ITAC Assessment: LE0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Precision Machine parts
NAICS 332710: Machine Shops
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 85,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,001 3,026,286
kWh
Electricity Demand $29,160 6,956
kW-mo/yr
Electricity Fees $9,759 -
Natural Gas $6,564 627
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,450 $35 $1,341
17,882
kWh
$109
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,482 $9,285 $4,109
54,792
kWh
$373
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,254 $5,350 $1,646
21,952
kWh
$608
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $12,522 $56,000 $11,466
152,880
kWh
$1,056
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $4,030 $675
9,001
kWh
$155
-
kW-mo/yr
TOTAL RECOMMENDED $21,538 $74,700 $19,238
256,507
kWh
$2,300
-
kW-mo/yr
TOTAL IMPLEMENTED $9,016 $18,700 $7,772
103,627
kWh
$1,244
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs