| Assessment Year | 2016 |
|---|---|
| Principal Product | Precision Machine parts |
| NAICS | 332710: Machine Shops |
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 31 |
| Plant Area |
85,000
ft2
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $226,001 | 3,026,286 |
kWh
|
$0.075 |
| Electricity Demand | $29,160 | 6,956 |
kW-mo/yr
|
$4.19 |
| Electricity Fees | $9,759 | - |
|
- |
| Natural Gas | $6,564 | 627 |
MMBtu
|
$10.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,016 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,450 | $35 |
$1,341
17,882
kWh
|
$109
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,482 | $9,285 |
$4,109
54,792
kWh
|
$373
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,254 | $5,350 |
$1,646
21,952
kWh
|
$608
-
kW-mo/yr
|
|
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $12,522 | $56,000 |
$11,466
152,880
kWh
|
$1,056
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $830 | $4,030 |
$675
9,001
kWh
|
$155
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $21,538 | $74,700 |
$19,238
256,507
kWh
|
$2,300
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $9,016 | $18,700 |
$7,772
103,627
kWh
|
$1,244
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs