ITAC Assessment: KU0030
ITAC logo
ITAC Assessment: KU0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PRINTING AND PLASTICS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 5,313
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,128 898,007
kWh
Natural Gas $12,710 4,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $740 $100 $740
11,723
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,997 $3,000 $2,997
47,186
kWh
-
03 2.6121: Reduce hot water temperature to the minimum required $439 - $369
5,862
kWh
$70
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,297 $500 - $1,297
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $3,146 $3,500 - $3,146
-
MMBtu
06 2.5194: Redesign process $11,311 $80,000 $11,311
177,902
kWh
-
TOTAL RECOMMENDED $19,930 $87,100 $15,417
242,673
kWh
$4,513
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs