ITAC Assessment: KU0026
ITAC logo
ITAC Assessment: KU0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product FLOUR,FARINA & FEED
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 226,000
lb
Production Hrs. Annual 6,792
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,328 9,117,527
kWh
Natural Gas $19,870 7,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,100 $8,200 $6,100
-
kWh
-
02 2.6232: Install set-back timers $15,466 $16,824 $15,466
420,868
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $370 $500 $370
10,258
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,128 - $1,128
30,774
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $238 $100 - $238
-
MMBtu
TOTAL RECOMMENDED $23,302 $25,624 $23,064
461,900
kWh
$238
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs