| Assessment Year | 2002 |
|---|---|
| Principal Product | Lead Recycling |
| NAICS |
n/a
|
| SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
| Sales Range | $50 M to 100M |
| # of Employees | 170 |
| Plant Area |
144,000
ft2
|
| Annual Production | 95,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $570,463 | 19,898,842 |
kWh
|
$0.029 |
| Electricity Demand | $268,948 | 40,080 |
kW-mo/yr
|
$6.71 |
| Natural Gas | $1,907,361 | 285,656 |
MMBtu
|
$6.68 |
| LPG | $61,721 | 8,749 |
MMBtu
|
$7.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,711 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,625 | $177 |
$1,106
38,543
kWh
|
$519
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,623 | $100 |
$1,104
38,450
kWh
|
$519
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,108 | $17 |
$754
26,280
kWh
|
$354
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $70 | $133 |
$70
2,446
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,658 | - |
$3,699
128,892
kWh
|
$1,959
-
kW-mo/yr
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $9,250 | $25 | - | - |
$9,250
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,334 | $452 |
$6,733
234,611
kWh
|
$3,351
-
kW-mo/yr
|
$9,250
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,711 | $352 |
$5,629
196,161
kWh
|
$2,832
-
kW-mo/yr
|
$9,250
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs