ITAC Assessment: IA0307
ITAC logo
ITAC Assessment: IA0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Lead Recycling
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 144,000
ft2
Annual Production 95,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,463 19,898,842
kWh
Electricity Demand $268,948 40,080
kW-mo/yr
Natural Gas $1,907,361 285,656
MMBtu
LPG $61,721 8,749
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,625 $177 $1,106
38,543
kWh
$519
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,623 $100 $1,104
38,450
kWh
$519
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,108 $17 $754
26,280
kWh
$354
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $70 $133 $70
2,446
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,658 - $3,699
128,892
kWh
$1,959
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $9,250 $25 - - $9,250
-
MMBtu
TOTAL RECOMMENDED $19,334 $452 $6,733
234,611
kWh
$3,351
-
kW-mo/yr
$9,250
-
MMBtu
TOTAL IMPLEMENTED $17,711 $352 $5,629
196,161
kWh
$2,832
-
kW-mo/yr
$9,250
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs