ITAC Assessment: GT0389
ITAC logo
ITAC Assessment: GT0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BUILDING ADHESIVES
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area
n/a
Annual Production 3,475
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,299 160,903
kWh
Natural Gas $39,034 7,185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $710 - - $1,010
-
MMBtu
$(-300.0)
02 2.2136: Install / repair insulation on steam lines $1,021 $895 - $1,021
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $674 $250 $674
5,862
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $227 $195 $227
2,052
kWh
- -
05 2.7141: Lower light fixtures in high ceiling areas $1,240 $840 $1,240
10,844
kWh
- -
06 2.7261: Install timers and/or thermostats $4,710 $240 - $4,710
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $170 $262 $170
4,689
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $119 - $119
1,172
kWh
- -
TOTAL RECOMMENDED $8,871 $2,682 $2,430
24,619
kWh
$6,741
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $2,020 $1,157 $289
5,861
kWh
$2,031
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs